(336) 992-2503
Portfolio

Our Commercial Projects

A proven track record with national brands and complex commercial construction across North Carolina — from ground-up restaurant builds to multi-location medical and financial programs.

Project Spotlight

Featured Projects

Selected individual projects showcased in detail — from underground installation through final set.

Webster & Sons crew installing underground PVC plumbing at Chipotle Charlotte
Interior copper and PVC plumbing rough-in at Chipotle Charlotte
Completed Chipotle Charlotte exterior at 3029 Pineville Matthews Rd
Restaurant / RetailTenant Upfit

Chipotle Charlotte

3029 Pineville Matthews Rd, Charlotte, NC 28277
GC: CBI General Contractors
New Commercial Construction — Restaurant / Retail

Complete commercial plumbing installation for new construction, from underground piping through interior rough-in and final set.

  • Underground PVC installation
  • Interior copper rough-in
  • Full tenant upfit scope
  • Restaurant buildout
Webster & Sons crew installing underground PVC plumbing at Woodside View Dental Care
Completed water heater and copper piping installation at Woodside View Dental Care
Completed Woodside View Dental Care exterior at 3214 S Providence Road, Waxhaw NC
Medical / DentalCommercial Dental Construction

Woodside View Dental Care – Waxhaw

3214 S Providence Road, Suite 102, Waxhaw, NC 28173
GC: Brahma Construction Inc. — Project 25-026
Commercial Dental Construction — Heartland Dental Franchise

Full-scope commercial plumbing for a new Heartland Dental franchise location, from underground installation through dental operatory plumbing, copper domestic water distribution, and final fixture connections.

  • Underground plumbing installation
  • Copper domestic water distribution
  • Dental operatory plumbing
  • Water heater & expansion tank
  • Equipment & fixture connections
  • Final plumbing completion
Webster & Sons crew installing underground PVC plumbing at JP Morgan Chase Bank Chapel Hill
Above-ceiling plumbing rough-in installation at JP Morgan Chase Bank Chapel Hill
Completed JP Morgan Chase Bank exterior at night, Chapel Hill NC
Commercial PlumbingCommercial Bank Construction

JP Morgan Chase Bank – Chapel Hill

201 Village Center Dr, Chapel Hill, NC 27516
GC: McFarland Construction
Commercial Bank Construction — Financial / Banking

Full-scope commercial plumbing for a new JP Morgan Chase Bank branch, from underground installation and above-ceiling rough-in through water and waste piping systems, fixture installation, and final project completion.

  • Underground plumbing installation
  • Above-ceiling plumbing rough-in
  • Water and waste piping systems
  • Plumbing fixture installation
  • Final plumbing set and completion
Webster & Sons plumber installing exterior piping at Tractor Supply Co. Mebane
Completed Tractor Supply Co. storefront at night, Mebane NC
Navien tankless water heater and copper piping installation at Tractor Supply Co. Mebane
RetailCommercial Retail Construction

Tractor Supply Co. – Mebane

1301 Mebane Oaks Rd, Mebane, NC 27302
GC: DooleyMack
Commercial Retail Construction — Retail

Full-scope commercial plumbing for a new Tractor Supply Co. retail location, including underground installation, water and sanitary piping systems, tankless water heater installation, and final fixture and equipment connections.

  • Commercial plumbing installation
  • Underground plumbing
  • Water and sanitary piping
  • Tankless water heater installation
  • Fixture and equipment connections
  • Final plumbing installation
Interior wall rough-in with PVC DWV, copper water piping and Webster & Sons crew at Mavis Tires & Brakes Greensboro
Webster & Sons plumber connecting commercial restroom fixtures at Mavis Tires & Brakes Greensboro
Exterior backflow prevention assembly installed at Mavis Tires & Brakes Greensboro
Automotive / RetailCommercial New Construction

Mavis Tires & Brakes – Greensboro

In Progress
3258 Randleman Rd, Greensboro, NC 27406
GC: National Custom Corporate Services, Inc.
Commercial New Construction — Automotive / Retail

Full-scope commercial plumbing for a new Mavis Tires & Brakes location, covering underground systems through final fixture connections — including backflow prevention, commercial restroom plumbing, and complete domestic water and sanitary waste systems.

  • Underground plumbing
  • Domestic water piping
  • Sanitary waste & vent
  • Commercial restroom plumbing
  • Backflow prevention
  • Roof penetrations / coordination
  • Fixture installation & final connections
Webster & Sons technician installing copper water distribution and water heater at Dill Dinkers Pickleball Winston-Salem
Underground sanitary and waste rough-in with PVC stubs at Dill Dinkers Pickleball renovation, Winston-Salem NC
Completed Dill Dinkers Pickleball facility storefront at night, 3206 Silas Creek Pkwy, Winston-Salem NC
Sports & EntertainmentCommercial Renovation

Dill Dinkers Pickleball – Winston-Salem

3206 Silas Creek Pkwy, Winston-Salem, NC 27103
GC: C.E. Gleeson
Commercial Renovation — Recreational Facility

Webster & Sons Plumbing provided full-scope commercial plumbing for the renovation of an existing space into the Dill Dinkers indoor pickleball facility — coordinating underground sanitary and waste piping, domestic water distribution, copper piping and equipment connections, commercial restroom plumbing and fixtures, and water-heating system connections from rough-in through final completion.

  • Underground sanitary & waste piping
  • Domestic water distribution
  • Copper piping & equipment connections
  • Commercial restroom plumbing
  • Fixture installation
  • Water-heating system connections
  • Rough-in through final completion
Webster & Sons crew surveying and laying out underground plumbing infrastructure at BJ's Wholesale Club site, Selma NC
Two Webster & Sons plumbers installing PVC sanitary drain piping in underground trench inside BJ's Wholesale Club building shell, Selma NC
Webster & Sons technician installing roof drain penetrations on metal roof deck at BJ's Wholesale Club, Selma NC
Large-diameter overhead copper water distribution mains suspended from structural steel at BJ's Wholesale Club, Selma NC
Commercial water heater with copper piping, expansion tank and mechanical connections installed at BJ's Wholesale Club, Selma NC
Completed BJ's Wholesale Club facility exterior at sunset, 370 Trinity Springs Lane, Selma NC 27576
Large-Scale RetailCommercial New Construction

BJ's Wholesale Club – Selma, NC

370 Trinity Springs Lane, Selma, NC 27576
GC: Builtech Services, LLC
Large-Scale Commercial — Retail / Wholesale

Webster & Sons Plumbing executed multi-phase commercial plumbing across the full construction of this BJ's Wholesale Club location — coordinating manpower and equipment from early site preparation and underground infrastructure through overhead distribution, roof-level work, mechanical equipment connections, and final installation throughout the completed facility.

  • Underground site prep & layout
  • PVC sanitary & drainage piping
  • Overhead copper distribution
  • Roof-level drain penetrations
  • Mechanical & water system connections
  • Commercial water heating system
  • Rough-in through final completion
Interior rough-in phase at Olive Garden Selma NC — overhead plumbing infrastructure, framing, and insulation board installation
Commercial kitchen copper supply lines and floor drain connections under stainless prep tables at Olive Garden Selma NC
Webster & Sons technician installing bank of four Rinnai tankless water heaters with copper manifold at Olive Garden Selma NC
Webster & Sons operator running KATO mini-excavator during underground site preparation with PVC pipe stubs at Olive Garden Selma NC
Webster & Sons technician finishing concrete around commercial floor cleanout access cover at Olive Garden Selma NC
Completed Olive Garden Italian Kitchen exterior at sunset, 121 US Highway 70A East, Selma NC 27576
Full-Service RestaurantCommercial New Construction

Olive Garden – Selma, NC

121 US Highway 70A East, Selma, NC 27576
GC: Builtech Services, LLC
Large-Scale Commercial — Restaurant

Webster & Sons Plumbing delivered full-scope commercial plumbing for this Olive Garden location — from underground sanitary infrastructure and site preparation through commercial kitchen systems, mechanical connections, backflow prevention, testing, inspections, and final closeout.

  • Underground sanitary & drainage
  • Domestic water distribution
  • Commercial kitchen plumbing
  • Water booster pump installation
  • Commercial fixture installation
  • Backflow prevention & testing
  • Rough-in through final closeout

Ready to Add Your Project to This List?

Send us your plans and we'll respond with a competitive bid.